Develop and Test the Solution, Project Manager
Description
Each component part of the Solution as identified in the Design Specification and project plan is developed and tested. Each part is developed or acquired, tested, integrated with other components
as appropriate, and placed under change control.
- Develop and Test components
- Integrate components
- Pilot (if required) any components (services / training)
- Test Overall Solution against the client acceptance criteria
Audit Criteria
- Solution components developed and tested according to Design Specifications and implementation plan or project plan.
- Approved Solution components placed under configuration management or change control.
Document Templates
- Template Links
Forms
Process Details
- Test Results
References
Solution Design and Development
- Reference 1
Additional Details
Test Results
Solution and component tests are performed and the results of these tests are logged. Forms are provided to facilitate the records of these tests. These forms contain the following information:
Form |
Description |
Test Log |
A log of all tests performed and their results. This log contains: Test number |
Test Results Form |
This form records the results of each of the tests. This form contains: Test Number |
The test forms can be found in the file, SDLC_FRM001 Test Report Forms.